Plan care and dust protection together
We review server rooms, racks, plant, cooling peripherals, trays and raised floors with your team. This establishes the cleaning and checks needed. Where construction is planned, we include protection of affected IT areas.
Positive-pressure zones during construction
A temporary positive-pressure zone can help keep construction dust away from sensitive equipment. The area is enclosed and supplied with filtered air. A controlled pressure difference supports outward airflow and reduces entry of contaminated surrounding air. A transparent acrylic enclosure keeps the protected equipment visible. Construction and materials are selected for the installation and building work.
Prepare protection before work starts
Together with IT, facility management, the operator and contractors, we establish the protected area, access, sealing and airflow. Enclosures, dust barriers and airlocks may be suitable. The plan must account for cooling, escape routes and fire protection systems.
Monitor temperature and the protected area
During use, we check and record temperature, pressure, filter condition, air supply and sealing within the agreed scope. Cooling must continue to meet equipment requirements inside an enclosure. We discuss opened access points or changes to construction with the responsible team. Particle measurements can be commissioned in addition.
Routine checks between construction projects
We inspect agreed areas for visible deposits and review accessible air paths. The findings help adjust cleaning dates and scope. The care plan follows what we find at the site.
After construction
Before removing protective measures, we review conditions and cleaning needs with you. Fine cleaning, measurements and sign-off follow where commissioned. Removal and the return to normal operation are coordinated with the responsible contacts.
Who is responsible for each task?
Technical maintenance, electrical testing and fire-system checks belong with qualified specialists. We coordinate cleaning and protection with their work. Scope and checks are agreed in advance; we cannot give a blanket promise that no dust will enter.
Additional air cleaning
Where particles are a concern, mobile HEPA H14 units can be added. We plan their position, airflow and run time alongside cleaning and dust protection. See air cleaning and climate monitoring for details.





